• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Scale Modelling Now

Scale Modelling Techniques

  • HOME
  • CONTENTS
    • What’s New
    • Techniques Bank
    • Aircraft
    • Armour
    • Classic Kit Builds
    • Vehicles
    • Sci-Fi, Fantasy, Space
    • Maritime
    • Figures
    • Book Reviews
    • Dioramas
    • Gift Certificate
    • Modelling Workshops
    • Podcasts
  • WHAT WE OFFER
  • AREAS
    • Techniques Bank
    • Aircraft
    • Armour
    • Vehicles
    • Sci-Fi, Fantasy, Space
    • Maritime
    • Dioramas
    • Figures
  • FREE SAMPLES
  • EVENTS
  • NEWS
  • ABOUT
    • ABOUT US
    • TRADERS
  • LOGIN
  • CONTACT

Shackleton WR977 Work Starts at Newark Air Museum

July 26, 2023 By Francis Porter

On 25th July, 2023 installation work started on a bespoke scaffolding system around the nose and forward fuselage of Avro Shackleton WR977 at Newark Air Museum (NAM). This will allow teams of museum volunteers to work on this significant restoration and repainting project in safe conditions.

In 2023 NAM successfully installed jacking pads underneath the aircraft, which allowed refurbished jacks to be installed under both wings of the aircraft. This allowed NAM to make the aircraft safe; helped to mitigate issues with the main undercarriage structures; and allowed the visiting public to once again have some access inside the aircraft.

The installation of the new scaffolding by Inspired Scaffolding Services from Bilsthorpe near Newark will allow for restoration work to be undertaken on the front section of WR977 in a safe and secure manner. This work will include: sealing the main cockpit glazing; in-depth cleaning; conservation of, and the painting of this area of the aircraft.

For most of the work period, WR977 will remain as part of the museum’s open cockpit offer. The modest contributions for accessing this iconic aircraft (when possible) will contribute towards the ongoing fund raising campaign to cover the scaffolding hire costs and the cost of the weekly safety inspections.

The current anticipated timeframe for the work is ten weeks; from the end of July through to the first week of October.

In these challenging times NAM is seeking support to help fund the costs associated with the hire and regular safety inspections of the scaffolding. This NAM fund raising campaign can be accessed via the following Just Giving page:

https://www.justgiving.com/campaign/wr977-scaffolding-2023

Primary Sidebar



Social Media Contact

We have a very active presence on Facebook and Twitter. On Facebook you’ll be able to share and communicate with fellow modellers and the SMN team, hear announcements and where ‘hot news’ is often released first! Why not check them out now... Geoff

Address

You can always write to the Editor:

Geoff Coughlin
The Old School House
2 Church Street
Carlton Le Moorland
Lincolnshire
LN5 9HR
UK

Copyright © 2025 · Scale Modelling Now · Online Scale Modelling Magazine · Scale Modelling Techniques and Tips · Privacy Policy

ar Arabicbn Bengalibg Bulgarianzh-CN Chinese (Simplified)zh-TW Chinese (Traditional)cs Czechda Danishnl Dutchen Englishfi Finnishfr Frenchde Germanel Greekhi Hindihu Hungarianid Indonesianit Italianja Japanesemt Malteseno Norwegianpl Polishpt Portuguesepa Punjabiru Russianes Spanishsv Swedishth Thaitr Turkishuk Ukrainiancy Welshyi Yiddish
en English